<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Kerman Tablo Corp. &#187; Petrochemical</title>
	<atom:link href="http://kermantablo.com/en/?cat=42&#038;feed=rss2" rel="self" type="application/rss+xml" />
	<link>http://kermantablo.com/en</link>
	<description>Intelligent Solutions for a Better Life</description>
	<lastBuildDate>Tue, 13 Oct 2015 12:23:46 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>7’th olefin</title>
		<link>http://kermantablo.com/en/?p=818&#038;utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=7th-olefin</link>
		<comments>http://kermantablo.com/en/?p=818#comments</comments>
		<pubDate>Sun, 28 Oct 2012 20:29:46 +0000</pubDate>
		<dc:creator>Sahar Maroofi</dc:creator>
				<category><![CDATA[Petrochemical]]></category>

		<guid isPermaLink="false">http://kermantablo.com/en/?p=818</guid>
		<description><![CDATA[<p>Client: Marun petrochemical company Consultants: EIED Location: Mahshahr General Contractor: EIED Status: Final Acceptance Certificate Objective: Basic Design &#38; procurement &#38; manufacturing of medium voltage switchgear ,low voltage switchgear &#38; MCC ,lighting &#38; Distribution panels &#38; paower control unit (PCU) Plant Characteristics: C2+ Recovery plant KTC Scope of work: Basic design, procurement , manufacturing &#38; [&#8230;]</p><p>The post <a href="http://kermantablo.com/en/?p=818">7’th olefin</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></description>
				<content:encoded><![CDATA[<p><strong>Client:</strong> Marun petrochemical company<br />
<strong>Consultants:</strong> EIED<br />
<strong>Location:</strong> Mahshahr<br />
<strong>General Contractor:</strong> EIED<br />
<strong>Status:</strong> Final Acceptance Certificate<br />
<strong>Objective:</strong><br />
Basic Design &amp; procurement &amp; manufacturing of medium voltage switchgear ,low voltage switchgear &amp; MCC ,lighting &amp; Distribution panels &amp; paower control unit (PCU)<br />
Plant Characteristics: C2+ Recovery plant<br />
<strong>KTC Scope of work:</strong><br />
Basic design, procurement , manufacturing &amp; supervision</p>
<p>The post <a href="http://kermantablo.com/en/?p=818">7’th olefin</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://kermantablo.com/en/?feed=rss2&#038;p=818</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>West Ethylene Pipeline Compressor Station</title>
		<link>http://kermantablo.com/en/?p=472&#038;utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=petrochimical</link>
		<comments>http://kermantablo.com/en/?p=472#comments</comments>
		<pubDate>Thu, 04 Oct 2012 19:02:07 +0000</pubDate>
		<dc:creator>Sahar Maroofi</dc:creator>
				<category><![CDATA[Clients]]></category>
		<category><![CDATA[Petrochemical]]></category>

		<guid isPermaLink="false">http://kermantablo.com/en/?p=472</guid>
		<description><![CDATA[<p>Client: Petrochemical Industries Development Management Company (PIDMCO) Location: CS -1 Located at Assaluyeh(feed supply point) CS -4 Located at Tang-e-Fanni CS -5 Located at Pyaz Abad General Contractor: OTC C&#38;I Contractor: Kerman Tablo Co. KTC Status: Hand over to client Objective: KTC supplied all equipment, machineries, commodities, apparatus and materials in the fields of electrical, [&#8230;]</p><p>The post <a href="http://kermantablo.com/en/?p=472">West Ethylene Pipeline Compressor Station</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></description>
				<content:encoded><![CDATA[<p><strong>Client:</strong> Petrochemical Industries Development Management<br />
Company (PIDMCO)<br />
<strong>Location:<br />
</strong></p>
<ul>
<li>CS -1 Located at Assaluyeh(feed supply point)</li>
<li>CS -4 Located at Tang-e-Fanni</li>
<li>CS -5 Located at Pyaz Abad</li>
</ul>
<p><strong> General Contractor:</strong> OTC<br />
<strong>C&amp;I Contractor:</strong> Kerman Tablo Co. KTC<br />
<strong>Status:</strong> Hand over to client<br />
<strong>Objective:</strong><br />
KTC supplied all equipment, machineries, commodities,<br />
apparatus and materials in the fields of electrical, instrument,<br />
control and telecommunication system with all auxiliary and<br />
accessory items<br />
<strong>KTC Scope of work:</strong><br />
NPC/PIDEMCO have intended to perform ethylene gas transmission pipeline and gas compressor station from Assaluyeh and GACHSARAN to MAHABAD/MIYANDOAB for petrochemical planets with a 24” gas transmission pipeline and some gas compressor stations.</p>
<p>&nbsp;</p>
<p>The post <a href="http://kermantablo.com/en/?p=472">West Ethylene Pipeline Compressor Station</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://kermantablo.com/en/?feed=rss2&#038;p=472</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
