<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Kerman Tablo Corp. &#187; Oil &amp; Gas</title>
	<atom:link href="http://kermantablo.com/en/?cat=40&#038;feed=rss2" rel="self" type="application/rss+xml" />
	<link>http://kermantablo.com/en</link>
	<description>Intelligent Solutions for a Better Life</description>
	<lastBuildDate>Tue, 13 Oct 2015 12:23:46 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>IGAT V</title>
		<link>http://kermantablo.com/en/?p=754&#038;utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=igat-v</link>
		<comments>http://kermantablo.com/en/?p=754#comments</comments>
		<pubDate>Sun, 28 Oct 2012 19:11:54 +0000</pubDate>
		<dc:creator>Sahar Maroofi</dc:creator>
				<category><![CDATA[Clients]]></category>
		<category><![CDATA[Oil & Gas]]></category>
		<category><![CDATA[References]]></category>

		<guid isPermaLink="false">http://kermantablo.com/en/?p=754</guid>
		<description><![CDATA[<p>  </p><p>The post <a href="http://kermantablo.com/en/?p=754">IGAT V</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></description>
				<content:encoded><![CDATA[<p><strong>Client:</strong> National Iranian Gas Company NIGC<br />
<strong>Consultants:</strong> Oil Turbo compressor engineering company<br />
<strong>Location:</strong> Assaluye, Khormooj, Sardasht, Abpalchsh<br />
<strong>General Contractor:</strong> Oil turbo compressor engineering company<br />
<strong>Status:</strong> Site Acceptance Test(SAT)<br />
<strong>Objective:</strong><br />
Transmission of Sour Gas of Aghajari Wellhead Area for Gas Injection<br />
<strong>Plant Characteristics:</strong><br />
The dry gas is transported 500Km 56” pipeline for injection into the AGHA-JARI reservoir,<br />
2 GCS located in phase 6.788 &amp; 3 other GCS located along the pipeline,<br />
<strong>KTC Scope of work:</strong><br />
Power transformers, MV switchers, LV switchers &amp; MMC &amp; Capacitors. Aux, dist., panel, alarm panels, power management system, lv bus duct, dc &amp; ups systems, EEX lighting (fixtures &amp; socket outlet), normal lighting system, all lighting panels, lighting &amp; earth systems, EEX j.b &amp; glands, cable tray and ladders, EEX and normal local control station, conduits, neutral ground</p>
<p>The post <a href="http://kermantablo.com/en/?p=754">IGAT V</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://kermantablo.com/en/?feed=rss2&#038;p=754</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Persian Gas refinery and power plant</title>
		<link>http://kermantablo.com/en/?p=746&#038;utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=persian-gas-refinery-and-power-plant</link>
		<comments>http://kermantablo.com/en/?p=746#comments</comments>
		<pubDate>Sun, 28 Oct 2012 19:01:48 +0000</pubDate>
		<dc:creator>Sahar Maroofi</dc:creator>
				<category><![CDATA[Clients]]></category>
		<category><![CDATA[Oil & Gas]]></category>

		<guid isPermaLink="false">http://kermantablo.com/en/?p=746</guid>
		<description><![CDATA[<p>Client: Iranian Gas Engineering and Development Company (IGEDC) Location: Lamerd General Contractor: FARAB Co. Status: In progress Objective: -Power Management System (PMS) -Power Distribution Control System (PDCS) -Distributed Control System (DCS) -Load Sharing, Unit commitment, Automatic Generation Con&#8212;.trol (AGC) and Frequency control -Power study such as: Load flow, Short circuit, Motor &#8211;.starting,Contingency analysis, Stability analysis, Protection and &#8230;.Relay Coordination [&#8230;]</p><p>The post <a href="http://kermantablo.com/en/?p=746">Persian Gas refinery and power plant</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></description>
				<content:encoded><![CDATA[<p><strong>Client:</strong> Iranian Gas Engineering and Development<br />
Company (IGEDC)<br />
<strong>Location:</strong> Lamerd<br />
<strong>General Contractor:</strong> FARAB Co.<br />
<strong>Status:</strong> In progress<br />
<strong>Objective:</strong><br />
-Power Management System (PMS)<br />
-Power Distribution Control System (PDCS)<br />
-Distributed Control System (DCS)<br />
-Load Sharing, Unit commitment, Automatic Generation Con&#8212;.trol (AGC) and Frequency control<br />
-Power study such as: Load flow, Short circuit, Motor &#8211;.starting,Contingency analysis, Stability analysis, Protection and &#8230;.Relay Coordination<br />
-Intelligent and optimal Load Shedding<br />
-Synchronizing between units and main bus ties<br />
-Dynamic simulation of Power Plant and Refinery<br />
<strong>Plant Characteristics:</strong><br />
Parsian Gas Treating Company has built six Gas Turbine<br />
Generators (GTG). is working in Island and parallel mode<br />
with national grid.<br />
<strong>KTC Scope of work:</strong><br />
-engineering<br />
-procurement<br />
-manufacturing<br />
-training<br />
-supervisory on Commissioning and Installation<br />
-fAT &amp; SAT</p>
<p>The post <a href="http://kermantablo.com/en/?p=746">Persian Gas refinery and power plant</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://kermantablo.com/en/?feed=rss2&#038;p=746</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>SCADA of IOOC Offshore &amp; Onshore Platforms</title>
		<link>http://kermantablo.com/en/?p=736&#038;utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=scada-of-iooc-offshore-onshore-platforms</link>
		<comments>http://kermantablo.com/en/?p=736#comments</comments>
		<pubDate>Sun, 28 Oct 2012 18:53:16 +0000</pubDate>
		<dc:creator>Sahar Maroofi</dc:creator>
				<category><![CDATA[Clients]]></category>
		<category><![CDATA[Oil & Gas]]></category>
		<category><![CDATA[References]]></category>

		<guid isPermaLink="false">http://kermantablo.com/en/?p=736</guid>
		<description><![CDATA[<p>   </p><p>The post <a href="http://kermantablo.com/en/?p=736">SCADA of IOOC Offshore &#038; Onshore Platforms</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></description>
				<content:encoded><![CDATA[<p><strong>Client:</strong> NIOC-IOOC<br />
<strong>Contractor:</strong> KTC<br />
<strong>Status:</strong> Under Progress<br />
<strong>Objectives:</strong><br />
SCADA of IOOC Offshore &amp; Onshore Platforms within the Persian Gulf area including Kharg, Bahregan, Sirri &amp; Lavan districts and Tehran.<br />
<strong>Plant Characteristics:</strong><br />
-SCADA System, Historian &amp; Web Servers<br />
-ICSS(ESD) System includes monitoring and control of<br />
RTUs on wellheads &amp; Production Platforms<br />
-Radio Communication System<br />
-CCTV System<br />
-PV &amp; other supply Systems<br />
-Instrumentation<br />
<strong>KTC scope of work:</strong> EPC</p>
<p>The post <a href="http://kermantablo.com/en/?p=736">SCADA of IOOC Offshore &#038; Onshore Platforms</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://kermantablo.com/en/?feed=rss2&#038;p=736</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>NIGC SCADA system Hardware and software</title>
		<link>http://kermantablo.com/en/?p=730&#038;utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=nigc-scada-system-hardware-and-software</link>
		<comments>http://kermantablo.com/en/?p=730#comments</comments>
		<pubDate>Sun, 28 Oct 2012 18:46:38 +0000</pubDate>
		<dc:creator>Sahar Maroofi</dc:creator>
				<category><![CDATA[Clients]]></category>
		<category><![CDATA[Oil & Gas]]></category>

		<guid isPermaLink="false">http://kermantablo.com/en/?p=730</guid>
		<description><![CDATA[<p>Client: National Iranian Gas Company (NIGC) Consultants: Matn Co Location: 11000 Km GAS Pipeline. The whole territory of Iran General Contractor: Consortium of KermanTablo and Cegelec Companies Leading by Kerman Tablo Co. Status: Hand over to client Objective: SCADA system Hardware and software Plant Characteristics: -2 Redundant Dispatching Centers -35 Sub-Master SCADA Centers -342 RTUs including Refineries, Compressor stations, -LBVs, City [&#8230;]</p><p>The post <a href="http://kermantablo.com/en/?p=730">NIGC SCADA system Hardware and software</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></description>
				<content:encoded><![CDATA[<p><strong>Client:</strong> National Iranian Gas Company (NIGC)<br />
<strong>Consultants:</strong> Matn Co<br />
<strong>Location:</strong> 11000 Km GAS Pipeline. The whole territory of Iran<br />
<strong>General Contractor:</strong> Consortium of KermanTablo and<br />
Cegelec Companies Leading by Kerman Tablo Co.<br />
<strong>Status:</strong> Hand over to client<br />
<strong>Objective:</strong> SCADA system Hardware and software<br />
<strong>Plant Characteristics:</strong><br />
-2 Redundant Dispatching Centers<br />
-35 Sub-Master SCADA Centers<br />
-342 RTUs including Refineries, Compressor stations,<br />
-LBVs, City Gate Stations, Export Stations, Industries<br />
<strong>Key Data:</strong><br />
-11,000 km gas pipeline network<br />
-30,000 data points<br />
-Multi-level Dispatching Hierarchy in three Levels<br />
<strong>Communication Media Types:</strong><br />
-Digital Leased Line<br />
-Analog Leased Line<br />
-Dialup Line<br />
-Inmarsat<br />
-VSAT</p>
<p>The post <a href="http://kermantablo.com/en/?p=730">NIGC SCADA system Hardware and software</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://kermantablo.com/en/?feed=rss2&#038;p=730</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
