Client: National Iranian Gas Company NIGC
Consultants: Oil Turbo compressor engineering company
Location: Assaluye, Khormooj, Sardasht, Abpalchsh
General Contractor: Oil turbo compressor engineering company
Status: Site Acceptance Test(SAT)
Objective:
Transmission of Sour Gas of Aghajari Wellhead Area for Gas Injection
Plant Characteristics:
The dry gas is transported 500Km 56” pipeline for injection into the AGHA-JARI reservoir,
2 GCS located in phase 6.788 & 3 other GCS located along the pipeline,
KTC Scope of work:
Power transformers, MV switchers, LV switchers & MMC & Capacitors. Aux, dist., panel, alarm panels, power management system, lv bus duct, dc & ups systems, EEX lighting (fixtures & socket outlet), normal lighting system, all lighting panels, lighting & earth systems, EEX j.b & glands, cable tray and ladders, EEX and normal local control station, conduits, neutral ground