Persian Gas refinery and power plant

Client: Iranian Gas Engineering and Development
Company (IGEDC)
Location: Lamerd
General Contractor: FARAB Co.
Status: In progress
Objective:
-Power Management System (PMS)
-Power Distribution Control System (PDCS)
-Distributed Control System (DCS)
-Load Sharing, Unit commitment, Automatic Generation Con—.trol (AGC) and Frequency control
-Power study such as: Load flow, Short circuit, Motor –.starting,Contingency analysis, Stability analysis, Protection and ….Relay Coordination
-Intelligent and optimal Load Shedding
-Synchronizing between units and main bus ties
-Dynamic simulation of Power Plant and Refinery
Plant Characteristics:
Parsian Gas Treating Company has built six Gas Turbine
Generators (GTG). is working in Island and parallel mode
with national grid.
KTC Scope of work:
-engineering
-procurement
-manufacturing
-training
-supervisory on Commissioning and Installation
-fAT & SAT

27 October
The 12th International Electricity Exhibition of IRAN
18 September
License for Inductrial Automation & IT
28 May
2nd Internatinal Railway Exhibition
19 May
Kermantablo in Southern Pars 20th & 21srt Phases