7’th olefin

Client: Marun petrochemical company
Consultants: EIED
Location: Mahshahr
General Contractor: EIED
Status: Final Acceptance Certificate
Objective:
Basic Design & procurement & manufacturing of medium voltage switchgear ,low voltage switchgear & MCC ,lighting & Distribution panels & paower control unit (PCU)
Plant Characteristics: C2+ Recovery plant
KTC Scope of work:
Basic design, procurement , manufacturing & supervision

West Ethylene Pipeline Compressor Station

Client: Petrochemical Industries Development Management
Company (PIDMCO)
Location:

  • CS -1 Located at Assaluyeh(feed supply point)
  • CS -4 Located at Tang-e-Fanni
  • CS -5 Located at Pyaz Abad

General Contractor: OTC
C&I Contractor: Kerman Tablo Co. KTC
Status: Hand over to client
Objective:
KTC supplied all equipment, machineries, commodities,
apparatus and materials in the fields of electrical, instrument,
control and telecommunication system with all auxiliary and
accessory items
KTC Scope of work:
NPC/PIDEMCO have intended to perform ethylene gas transmission pipeline and gas compressor station from Assaluyeh and GACHSARAN to MAHABAD/MIYANDOAB for petrochemical planets with a 24” gas transmission pipeline and some gas compressor stations.

 

27 October
The 12th International Electricity Exhibition of IRAN
18 September
License for Inductrial Automation & IT
28 May
2nd Internatinal Railway Exhibition
19 May
Kermantablo in Southern Pars 20th & 21srt Phases