SiahBisheh Pumped Storage Project

Location:Chalous Road – SiahBishe Village
Client: IWPCO
Consultant:Moshanir
General Contractor :Farab
Sub. Contractor: KTC
Status: Test & Commissioning – First Unit Started-up
Objective: Power Generation and Network Frequency Control
Capacity: 4×250 MW
Turbine Type: Francis
Head Water Level: 440-545 M
Turbine Flow (For each Unit): 0-65 m3/s
Pump Flow (For each Unit): 0-55 m3/s
Scope of Supply: Electrical Protection and I&C

  • Unit Control Board (UCB1-4)
  • Switch Yard Control Board (SYCB)
  • Lower Reservoir Control Board (LRCB)
  • Upper Reservoir Control Board (URCB)
  • Auxiliary Control Board (AUCB)
  • Pump Starting Control Board (PSCB)
  • Remote Terminal Unit (RTU)
  • Auxiliary Mechanical: Drainage Panel, Dewatering Panel & Cooling System&…
  • Electrical Protection System (Unit1-4)

Services: Engineering, Procurement, Manufacturing, Installation & Commissioning
DCS Type: Persia A (KermanTablo DCS)

27 October
The 12th International Electricity Exhibition of IRAN
18 September
License for Inductrial Automation & IT
28 May
2nd Internatinal Railway Exhibition
19 May
Kermantablo in Southern Pars 20th & 21srt Phases