Client: National Iranian Copper Industries Company
Location: Kerman Province- West East PartofIran
General Contractor: Kerman Tablo Co. KTC
C&I Contractor: Kerman Tablo Co. KTC
Status: Finished
Objective:
Developing SCADA system of Khatoon Abad copper mill Power distribution network.
Plant Characteristics:
Khatoon Abad copper mill power distribution network With One 63kv, four 10.5 kV substations
KTC Scope of work:
Client: West Regional Electric Company
Consultants: WREC Consultant Engineers
Location: Six (6) Provinces in West of Iran
General Contractor: KTC
C&I Contractor: KTC
Status: FAC, Hand over to client
Objective:
Supervision and control of transmission network of six (6)
West Provinces including Kordestan, Kermanshah ,Ilam,
Lorestan,Hamedan and Markazi.
Plant Characteristics: Totally it contains twenty six (26) 400 kV and
230kv stations in first phaseand it is foreseen for expansion of
fifty (50) stations in second Phase.
KTC Scope of work:
Design, manufacturing & installation of 16 RTUs
Linking of fourteen (14) available RTUs in region to new center.
Design, manufacturing & installation of SCADA center
Linking between National Dispatching Center (SCC), Esfahan
center ( ESCC ) and new center.
Client: Mazandaran Regional Electric Company
Consultants: Monenco Consultant Engineers
Location: Three (3) Provinces in North of Iran including Mazandaran,Gilan and Golestan
General Contractor: KTC
C&I Contractor: KTC
Status: FAC, Hand over to client
Objective:
Supervision and control of Power Generation and transmission (230 & 400 kV) network of three (3 North Provinces including Golestan, Gilan and Mazandaran
Plant Characteristics: Totally it contains thirty (30) 400kv and 230kv stations at first phase, and it is foreseen for expansion of (50) stations in second phase.
KTC Scope of work:
Design, manufacturing & installation of 16 RTUs Linking of fourteen (14)existing RTUs in region to new center.Design, manufacturing & installation of SCADA center Linking between NationalDispatchingCenter (SCC), Esfahan center ( ESCC ) and new center.
Client: Fars Regional Electric Company
Consultants: Sana Control
Location: Fars Province
General Contractor: Kerman Tablo Co. KTC
C&I Contractor: Kerman Tablo Co. KTC
Status: FAC, Hand over to client
Objective: Supervision and control of distribution network
Plant Characteristics: Totally it contains eighteen(18) stations in first
phase, and it is foreseen to expand more 300 stations for 2nd phase.
KTC Scope of work: EPC
Client: Tehran Regional Power Company
Consultants: Monenco Consultant Engineers
Location: Tehran City- Capital of Iran
General Contractor: KTC
C&I Contractor: KTC
Status: FAC, Hand over to client
Objective:
Establishment of a system controlling and supervising east North,East South and West South of Tehran including fifty (50) Power substations.
Plant Characteristics: Tehran regional power distribution network contains seven (7) Sub master and one (1) master dispatching center(s).Kerman Tablo is responsible for commissioning three centers & linking between them.
KTC Scope of work:
Design, manufacturing & installation of 50 RTUs.
Design, manufacturing & installation of 3 control centers.
Location: Tajikistan
Client:Farab
Sub-Contractor: KTC
Status: Provisional Acceptance Certificate (PAC)
Objective: Power Generation
Capacity: 2×110 MW
Turbine Type: Kaplan
Head Water Level: 507-510 M
Turbine Water Flow: 0-588.1 m3/s
Scope of Supply: Electrical & I&C
Services: Engineering, Procurement, Manufacturing, Installation & Commissioning
DCS Type:Persia A (KermanTablo DCS)
(This Distributed Control System is provided at KermanTablo Company and Developed by the Expert Engineers in this Company)
Location:Chalous Road – SiahBishe Village
Client: IWPCO
Consultant:Moshanir
General Contractor :Farab
Sub. Contractor: KTC
Status: Test & Commissioning – First Unit Started-up
Objective: Power Generation and Network Frequency Control
Capacity: 4×250 MW
Turbine Type: Francis
Head Water Level: 440-545 M
Turbine Flow (For each Unit): 0-65 m3/s
Pump Flow (For each Unit): 0-55 m3/s
Scope of Supply: Electrical Protection and I&C
Services: Engineering, Procurement, Manufacturing, Installation & Commissioning
DCS Type: Persia A (KermanTablo DCS)
Client: National Iranian Gas Company NIGC
Consultants: Oil Turbo compressor engineering company
Location: Assaluye, Khormooj, Sardasht, Abpalchsh
General Contractor: Oil turbo compressor engineering company
Status: Site Acceptance Test(SAT)
Objective:
Transmission of Sour Gas of Aghajari Wellhead Area for Gas Injection
Plant Characteristics:
The dry gas is transported 500Km 56” pipeline for injection into the AGHA-JARI reservoir,
2 GCS located in phase 6.788 & 3 other GCS located along the pipeline,
KTC Scope of work:
Power transformers, MV switchers, LV switchers & MMC & Capacitors. Aux, dist., panel, alarm panels, power management system, lv bus duct, dc & ups systems, EEX lighting (fixtures & socket outlet), normal lighting system, all lighting panels, lighting & earth systems, EEX j.b & glands, cable tray and ladders, EEX and normal local control station, conduits, neutral ground
Client: Iranian Gas Engineering and Development
Company (IGEDC)
Location: Lamerd
General Contractor: FARAB Co.
Status: In progress
Objective:
-Power Management System (PMS)
-Power Distribution Control System (PDCS)
-Distributed Control System (DCS)
-Load Sharing, Unit commitment, Automatic Generation Con—.trol (AGC) and Frequency control
-Power study such as: Load flow, Short circuit, Motor –.starting,Contingency analysis, Stability analysis, Protection and ….Relay Coordination
-Intelligent and optimal Load Shedding
-Synchronizing between units and main bus ties
-Dynamic simulation of Power Plant and Refinery
Plant Characteristics:
Parsian Gas Treating Company has built six Gas Turbine
Generators (GTG). is working in Island and parallel mode
with national grid.
KTC Scope of work:
-engineering
-procurement
-manufacturing
-training
-supervisory on Commissioning and Installation
-fAT & SAT
Client: NIOC-IOOC
Contractor: KTC
Status: Under Progress
Objectives:
SCADA of IOOC Offshore & Onshore Platforms within the Persian Gulf area including Kharg, Bahregan, Sirri & Lavan districts and Tehran.
Plant Characteristics:
-SCADA System, Historian & Web Servers
-ICSS(ESD) System includes monitoring and control of
RTUs on wellheads & Production Platforms
-Radio Communication System
-CCTV System
-PV & other supply Systems
-Instrumentation
KTC scope of work: EPC
Client: National Iranian Gas Company (NIGC)
Consultants: Matn Co
Location: 11000 Km GAS Pipeline. The whole territory of Iran
General Contractor: Consortium of KermanTablo and
Cegelec Companies Leading by Kerman Tablo Co.
Status: Hand over to client
Objective: SCADA system Hardware and software
Plant Characteristics:
-2 Redundant Dispatching Centers
-35 Sub-Master SCADA Centers
-342 RTUs including Refineries, Compressor stations,
-LBVs, City Gate Stations, Export Stations, Industries
Key Data:
-11,000 km gas pipeline network
-30,000 data points
-Multi-level Dispatching Hierarchy in three Levels
Communication Media Types:
-Digital Leased Line
-Analog Leased Line
-Dialup Line
-Inmarsat
-VSAT
Client: Esfahan Regional Water Company (ERWC)
Consultants: Rey-Ab Consultant Eng. Co.
Location: Esfahan(Zayandeh-Rood) to Kashan water transfer line
General Contractor: KTC
Status: Test & Commissioning
Objective:
SCADA system Hardware and software & Local Control.
Plant Characteristics:
Components:
A Redundant SCADA Center well-equipped with a six-cube
Large Scale Display
21 RTU/PLC’s for data gathering and redundant controling for12
stations including Reservoirs Stations, Pressure Reduction
Stations, Pump House Station and Water Treatment Station
10 LHMI for local monitoring
Key Data:
300 km water transfer line
2000 data points
Local control in 12 interacting stations including flow control
and level control in high pressure conditions
KTC Scope of work: EPC
Client: Khouzestan Water & Power Authority
Consultants: Mahab Ghods
Location: Khouzestan Province- West South of Iran
General Contractor: KTC
C&I Contractor: KTC
Status: Final Acceptance Certificate – Hand Over to Client
Objective:
Control of river water against Salty Sea Water for irrigation of
date palms gardens ( 28000 Hectares)
Plant Characteristics:
Transferring water from KARUN to BAHMANSHIR in a capacity
of 120 C.M. per second for feeding Torreh Bokhah P.S. & pushing
back sea water from Bahmanshir river. Torreh-Bokhah P.S. feeds
twenty two secondary ( pump stations ) by a closed canal.
Secondary is foreseen to deliver water to date palms gardens.
KTC Scope of work:
Engineering of electrical and control system.
Medium voltage 36 KV switchgears.
Low voltage 660 V MCCs & distribution 0.4 KV panels .
Emergency power supplies, fire detection, diesel generator sets.
Computerized control systems with radio links .
Salinity measuring points & other physical parameters.
Client: Petrochemical Industries Development Management
Company (PIDMCO)
Location:
General Contractor: OTC
C&I Contractor: Kerman Tablo Co. KTC
Status: Hand over to client
Objective:
KTC supplied all equipment, machineries, commodities,
apparatus and materials in the fields of electrical, instrument,
control and telecommunication system with all auxiliary and
accessory items
KTC Scope of work:
NPC/PIDEMCO have intended to perform ethylene gas transmission pipeline and gas compressor station from Assaluyeh and GACHSARAN to MAHABAD/MIYANDOAB for petrochemical planets with a 24” gas transmission pipeline and some gas compressor stations.
Client: Esfahan Steel mill Factory
Consultants: Esfahan Operation Dept.
Location: EsfahanProvince-CentralPartofIran
General Contractor: Kerman Tablo Co. KTC
C&I Contractor: Kerman Tablo Co. KTC
Status: Finished
Objective:
Replacement of conventional SCADA system of Esfahan steel mill Power distribution and production network with a new one Plant
Characteristics:
Esfahan steel mill power production and distribution network With the capacity of about 150MW in two steam power Plants,one gas Power plant, one 230kv, three 63kv,ten10.5 kV, Seventeen 6.3 kV station(s).(Totally 34 stations)
KTC Scope of work:
IOOC
Client: NIOC-IOOC
Contractor: KTC
Status: Under Progress
Objectives:
SCADA of IOOC Offshore & Onshore Platforms within the Persian Gulf area including Kharg, Bahregan, Sirri & Lavan districts and Tehran.
PlantCharacteristics:
NIGC
Client: National Iranian Gas Company (NIGC)
Consultants: Matn Co
Location: 11000 Km GAS Pipeline. The whole territory of Iran
General Contractor: Consortium of KermanTablo and
CegelecATCompanies Leading by Kerman Tablo Co.
Status: Finished
Objective: SCADA system Hardware and software
Plant Characteristics:
-2 Redundant Dispatching Centers
-35 Sub-Master SCADA Centers
-342 RTUs including Refineries, Compressor stations,
-LBVs, City Gate Stations, Export Stations, Industries
Key Data:
-11,000 km gas pipeline network
-30,000 data points
-Multi-level Dispatching Hierarchy in three Levels
Communication Media Types:
-Digital Leased Line
-Analog Leased Line
-Dialup Line
-Inmarsat
-VSAT