<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Kerman Tablo Corp. &#187; Clients</title>
	<atom:link href="http://kermantablo.com/en/?cat=49&#038;feed=rss2" rel="self" type="application/rss+xml" />
	<link>http://kermantablo.com/en</link>
	<description>Intelligent Solutions for a Better Life</description>
	<lastBuildDate>Tue, 13 Oct 2015 12:23:46 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Khatoon Abad Copper</title>
		<link>http://kermantablo.com/en/?p=840&#038;utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=khatoon-abad-copper</link>
		<comments>http://kermantablo.com/en/?p=840#comments</comments>
		<pubDate>Sun, 28 Oct 2012 20:56:02 +0000</pubDate>
		<dc:creator>Sahar Maroofi</dc:creator>
				<category><![CDATA[Clients]]></category>
		<category><![CDATA[Mine & Metal]]></category>

		<guid isPermaLink="false">http://kermantablo.com/en/?p=840</guid>
		<description><![CDATA[<p>Client:  National Iranian Copper Industries Company Location: Kerman Province- West East PartofIran General Contractor: Kerman Tablo Co. KTC C&#38;I Contractor: Kerman Tablo Co. KTC Status: Finished Objective: Developing SCADA system of Khatoon Abad copper mill Power distribution network. Plant Characteristics: Khatoon Abad copper mill power distribution network With One 63kv, four 10.5 kV substations  KTC [&#8230;]</p><p>The post <a href="http://kermantablo.com/en/?p=840">Khatoon Abad Copper</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></description>
				<content:encoded><![CDATA[<p><strong>Client: </strong> National Iranian Copper Industries Company<br />
<strong>Location:</strong> Kerman Province- West East PartofIran<br />
<strong>General Contractor:</strong> Kerman Tablo Co. KTC<br />
<strong>C&amp;I Contractor:</strong> Kerman Tablo Co. KTC<br />
<strong>Status:</strong> Finished</p>
<p><strong>Objective:</strong><br />
Developing SCADA system of Khatoon Abad copper mill Power distribution network.</p>
<p><strong>Plant Characteristics:<br />
</strong> Khatoon Abad copper mill power distribution network With One 63kv, four 10.5 kV substations</p>
<p><strong> KTC Scope of work:</strong></p>
<ul>
<li>design, manufacturing &amp; installation of about one Thousand (1000) intelligent Power meter</li>
<li>design, manufacturing &amp; installation of 5 RTUs</li>
<li>design, manufacturing &amp; installation of a control center so that all hardware. components and computer network are redundant and each workstation connects to two monitors.</li>
</ul>
<p>The post <a href="http://kermantablo.com/en/?p=840">Khatoon Abad Copper</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://kermantablo.com/en/?feed=rss2&#038;p=840</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>West Area Operating Center (WAOC)</title>
		<link>http://kermantablo.com/en/?p=810&#038;utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=west-area-operating-center-waoc</link>
		<comments>http://kermantablo.com/en/?p=810#comments</comments>
		<pubDate>Sun, 28 Oct 2012 20:23:10 +0000</pubDate>
		<dc:creator>Sahar Maroofi</dc:creator>
				<category><![CDATA[Clients]]></category>
		<category><![CDATA[Power Network]]></category>

		<guid isPermaLink="false">http://kermantablo.com/en/?p=810</guid>
		<description><![CDATA[<p>Client: West Regional Electric Company Consultants: WREC Consultant Engineers Location: Six (6) Provinces in West of Iran General Contractor: KTC C&#38;I Contractor: KTC Status: FAC, Hand over to client Objective: Supervision and control of transmission network of six (6) West Provinces including Kordestan, Kermanshah ,Ilam, Lorestan,Hamedan and Markazi. Plant Characteristics: Totally it contains twenty six [&#8230;]</p><p>The post <a href="http://kermantablo.com/en/?p=810">West Area Operating Center (WAOC)</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></description>
				<content:encoded><![CDATA[<p><strong>Client:</strong> West Regional Electric Company<br />
<strong>Consultants:</strong> WREC Consultant Engineers<br />
<strong>Location:</strong> Six (6) Provinces in West of Iran<br />
<strong>General Contractor:</strong> KTC<br />
<strong>C&amp;I Contractor:</strong> KTC<br />
<strong>Status:</strong> FAC, Hand over to client<br />
<strong>Objective:</strong><br />
Supervision and control of transmission network of six (6)<br />
West Provinces including Kordestan, Kermanshah ,Ilam,<br />
Lorestan,Hamedan and Markazi.<br />
Plant Characteristics: Totally it contains twenty six (26) 400 kV and<br />
230kv stations in  first phaseand it is foreseen for expansion of<br />
fifty (50) stations in  second Phase.</p>
<p><strong>KTC Scope of work:</strong><br />
Design, manufacturing &amp; installation of 16 RTUs<br />
Linking of fourteen (14) available RTUs in region to new center.<br />
Design, manufacturing &amp; installation of SCADA center<br />
Linking between National Dispatching Center (SCC), Esfahan<br />
center ( ESCC ) and new center.</p>
<p>&nbsp;</p>
<p>The post <a href="http://kermantablo.com/en/?p=810">West Area Operating Center (WAOC)</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://kermantablo.com/en/?feed=rss2&#038;p=810</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>North Area Operating Center (NAOC)</title>
		<link>http://kermantablo.com/en/?p=800&#038;utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=north-area-operating-center-naoc</link>
		<comments>http://kermantablo.com/en/?p=800#comments</comments>
		<pubDate>Sun, 28 Oct 2012 20:05:48 +0000</pubDate>
		<dc:creator>Sahar Maroofi</dc:creator>
				<category><![CDATA[Clients]]></category>
		<category><![CDATA[Power Network]]></category>

		<guid isPermaLink="false">http://kermantablo.com/en/?p=800</guid>
		<description><![CDATA[<p>Client: Mazandaran Regional Electric Company Consultants: Monenco Consultant Engineers Location: Three (3) Provinces in North of Iran including Mazandaran,Gilan and Golestan General Contractor: KTC C&#38;I Contractor: KTC Status: FAC, Hand over to client Objective: Supervision and control of Power Generation and transmission (230 &#38; 400 kV) network of three (3 North Provinces including Golestan, Gilan [&#8230;]</p><p>The post <a href="http://kermantablo.com/en/?p=800">North Area Operating Center (NAOC)</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></description>
				<content:encoded><![CDATA[<p><strong>Client:</strong> Mazandaran Regional Electric Company<br />
<strong>Consultants:</strong> Monenco Consultant Engineers<br />
<strong>Location:</strong> Three (3) Provinces in North of Iran including Mazandaran,Gilan and Golestan<br />
<strong>General Contractor:</strong> KTC<br />
<strong>C&amp;I Contractor:</strong> KTC<br />
<strong>Status:</strong> FAC, Hand over to client</p>
<p><strong>Objective:</strong><br />
Supervision and control of Power Generation and transmission (230 &amp; 400 kV) network of three (3 North Provinces including Golestan, Gilan and Mazandaran<br />
Plant Characteristics: Totally it contains thirty (30) 400kv and 230kv stations at first  phase, and it is foreseen for expansion of (50) stations in second phase.</p>
<p><strong>KTC Scope of work:<br />
</strong>Design, manufacturing &amp; installation of 16 RTUs Linking of fourteen (14)existing RTUs in region to new center.Design, manufacturing &amp; installation of SCADA center Linking between NationalDispatchingCenter (SCC), Esfahan center ( ESCC ) and new center.</p>
<p>&nbsp;</p>
<p>The post <a href="http://kermantablo.com/en/?p=800">North Area Operating Center (NAOC)</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://kermantablo.com/en/?feed=rss2&#038;p=800</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Shiraz Power Distribution</title>
		<link>http://kermantablo.com/en/?p=789&#038;utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=shiraz-power-distribution</link>
		<comments>http://kermantablo.com/en/?p=789#comments</comments>
		<pubDate>Sun, 28 Oct 2012 19:53:46 +0000</pubDate>
		<dc:creator>Sahar Maroofi</dc:creator>
				<category><![CDATA[Clients]]></category>
		<category><![CDATA[Power Network]]></category>

		<guid isPermaLink="false">http://kermantablo.com/en/?p=789</guid>
		<description><![CDATA[<p>Client: Fars Regional Electric Company Consultants: Sana Control Location: Fars Province General Contractor: Kerman Tablo Co. KTC C&#38;I Contractor: Kerman Tablo Co. KTC Status: FAC, Hand over to client Objective: Supervision and control of distribution network Plant Characteristics: Totally it contains eighteen(18) stations in first phase, and it is foreseen to expand more 300 stations [&#8230;]</p><p>The post <a href="http://kermantablo.com/en/?p=789">Shiraz Power Distribution</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></description>
				<content:encoded><![CDATA[<p><strong>Client:</strong> Fars Regional Electric Company<br />
<strong>Consultants:</strong> Sana Control<br />
<strong>Location:</strong> Fars Province<br />
<strong>General Contractor:</strong> Kerman Tablo Co. KTC<br />
<strong>C&amp;I Contractor:</strong> Kerman Tablo Co. KTC<br />
<strong>Status:</strong> FAC, Hand over to client<br />
<strong>Objective:</strong> Supervision and control of distribution network<br />
Plant Characteristics: Totally it contains eighteen(18) stations in first<br />
phase, and it is foreseen to expand more 300 stations for 2nd phase.<br />
<strong>KTC Scope of work:</strong> EPC</p>
<p>&nbsp;</p>
<p>The post <a href="http://kermantablo.com/en/?p=789">Shiraz Power Distribution</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://kermantablo.com/en/?feed=rss2&#038;p=789</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Tehran Power Sub-Transmission Network</title>
		<link>http://kermantablo.com/en/?p=781&#038;utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=tehran-power-sub-transmission-network</link>
		<comments>http://kermantablo.com/en/?p=781#comments</comments>
		<pubDate>Sun, 28 Oct 2012 19:46:27 +0000</pubDate>
		<dc:creator>Sahar Maroofi</dc:creator>
				<category><![CDATA[Clients]]></category>
		<category><![CDATA[Power Network]]></category>

		<guid isPermaLink="false">http://kermantablo.com/en/?p=781</guid>
		<description><![CDATA[<p>Client: Tehran Regional Power Company Consultants: Monenco Consultant Engineers Location: Tehran City- Capital of Iran General Contractor: KTC C&#38;I Contractor: KTC Status: FAC, Hand over to client Objective: Establishment of a system controlling and supervising east North,East South and West South of Tehran including fifty (50) Power substations. Plant Characteristics: Tehran regional power distribution network contains seven (7) Sub master [&#8230;]</p><p>The post <a href="http://kermantablo.com/en/?p=781">Tehran Power Sub-Transmission Network</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></description>
				<content:encoded><![CDATA[<p><strong>Client:</strong> Tehran Regional Power Company<br />
<strong>Consultants</strong>: Monenco Consultant Engineers<br />
<strong>Location:</strong> Tehran City- Capital of Iran<br />
<strong>General Contractor:</strong> KTC<br />
<strong>C&amp;I Contractor:</strong> KTC<br />
<strong>Status:</strong> FAC, Hand over to client<br />
<strong>Objective:</strong><br />
Establishment of a system controlling and supervising east North,East South and West South of Tehran including fifty (50) Power substations.<br />
Plant Characteristics: Tehran regional power distribution network contains seven (7) Sub master and one (1) master dispatching center(s).Kerman Tablo is responsible for commissioning three centers &amp; linking between them.<br />
<strong>KTC Scope of work:</strong><br />
Design, manufacturing &amp; installation of 50 RTUs.<br />
Design, manufacturing &amp; installation of 3 control centers.</p>
<p>The post <a href="http://kermantablo.com/en/?p=781">Tehran Power Sub-Transmission Network</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://kermantablo.com/en/?feed=rss2&#038;p=781</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Tajikistan Sangtoudeh 2- DAM &amp; H.P.P Project</title>
		<link>http://kermantablo.com/en/?p=774&#038;utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=tajikistan-sangtoudeh-2-dam-h-p-p-project</link>
		<comments>http://kermantablo.com/en/?p=774#comments</comments>
		<pubDate>Sun, 28 Oct 2012 19:31:34 +0000</pubDate>
		<dc:creator>Sahar Maroofi</dc:creator>
				<category><![CDATA[Clients]]></category>
		<category><![CDATA[Power Plant]]></category>
		<category><![CDATA[References]]></category>

		<guid isPermaLink="false">http://kermantablo.com/en/?p=774</guid>
		<description><![CDATA[<p>Location: Tajikistan Client:Farab Sub-Contractor: KTC Status: Provisional Acceptance Certificate (PAC) Objective: Power Generation Capacity: 2×110 MW Turbine Type: Kaplan Head Water Level: 507-510 M Turbine Water Flow: 0-588.1 m3/s Scope of Supply: Electrical &#38; I&#38;C Unit Control Board (UCB 1-2) LV AC &#38; DC System &#38; Lighting System Clock System Emergency Shut Down Panel (ESD) Station Service Control Panel (SSC) High Voltage PLC Panel [&#8230;]</p><p>The post <a href="http://kermantablo.com/en/?p=774">Tajikistan Sangtoudeh 2- DAM &#038; H.P.P Project</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></description>
				<content:encoded><![CDATA[<p><strong>Location:</strong> Tajikistan<br />
<strong>Client:</strong>Farab<br />
<strong>Sub-Contractor:</strong> KTC<br />
<strong>Status:</strong> Provisional Acceptance Certificate (PAC)<br />
<strong>Objective:</strong> Power Generation<br />
<strong>Capacity: </strong>2×110 MW<br />
<strong>Turbine Type:</strong> Kaplan<br />
<strong>Head Water Level:</strong> 507-510 M<br />
<strong>Turbine Water Flow: </strong>0-588.1 m<sup>3</sup>/s<br />
<strong>Scope of Supply:</strong> Electrical &amp; I&amp;C</p>
<ul>
<li>Unit Control Board (UCB 1-2)</li>
<li>LV AC &amp; DC System &amp; Lighting System</li>
<li>Clock System</li>
<li>Emergency Shut Down Panel (ESD)</li>
<li>Station Service Control Panel (SSC)</li>
<li>High Voltage PLC Panel (HV PLC)</li>
<li>Remote Terminal Unit (RTU)</li>
<li>Auxiliary Mechanical: Drainage Panel, Dewatering Panel &amp; Cooling System&amp;…</li>
</ul>
<p><strong>Services:</strong> Engineering, Procurement, Manufacturing, Installation &amp; Commissioning<br />
<strong>DCS Type:</strong>Persia A (KermanTablo DCS)</p>
<p>(This Distributed Control System is provided at KermanTablo Company and Developed by the Expert Engineers in this Company)</p>
<p>The post <a href="http://kermantablo.com/en/?p=774">Tajikistan Sangtoudeh 2- DAM &#038; H.P.P Project</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://kermantablo.com/en/?feed=rss2&#038;p=774</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>SiahBisheh Pumped Storage Project</title>
		<link>http://kermantablo.com/en/?p=764&#038;utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=siahbisheh-pumped-storage-project</link>
		<comments>http://kermantablo.com/en/?p=764#comments</comments>
		<pubDate>Sun, 28 Oct 2012 19:22:13 +0000</pubDate>
		<dc:creator>Sahar Maroofi</dc:creator>
				<category><![CDATA[Clients]]></category>
		<category><![CDATA[Power Plant]]></category>

		<guid isPermaLink="false">http://kermantablo.com/en/?p=764</guid>
		<description><![CDATA[<p>Location:Chalous Road – SiahBishe Village Client: IWPCO Consultant:Moshanir General Contractor :Farab Sub. Contractor: KTC Status: Test &#38; Commissioning &#8211; First Unit Started-up Objective: Power Generation and Network Frequency Control Capacity: 4×250 MW Turbine Type: Francis Head Water Level: 440-545 M Turbine Flow (For each Unit): 0-65 m3/s Pump Flow (For each Unit): 0-55 m3/s Scope of Supply: Electrical Protection and I&#38;C Unit Control Board (UCB1-4) [&#8230;]</p><p>The post <a href="http://kermantablo.com/en/?p=764">SiahBisheh Pumped Storage Project</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></description>
				<content:encoded><![CDATA[<p><strong>Location:</strong>Chalous Road – SiahBishe Village<br />
<strong>Client:</strong> IWPCO<br />
<strong>Consultant:</strong>Moshanir<br />
<strong>General Contractor :</strong>Farab<br />
<strong>Sub. Contractor:</strong> KTC<br />
<strong>Status:</strong> Test &amp; Commissioning &#8211; First Unit Started-up<br />
<strong>Objective:</strong> Power Generation and Network Frequency Control<br />
<strong>Capacity:</strong> 4×250 MW<br />
<strong>Turbine Type:</strong> Francis<br />
<strong>Head Water Level:</strong> 440-545 M<br />
<strong>Turbine Flow (For each Unit):</strong> 0-65 m<sup>3</sup>/s<br />
<strong>Pump Flow (For each Unit):</strong> 0-55 m<sup>3</sup>/s<br />
<strong>Scope of Supply:</strong> Electrical Protection and I&amp;C</p>
<ul>
<li>Unit Control Board (UCB1-4)</li>
<li>Switch Yard Control Board (SYCB)</li>
<li>Lower Reservoir Control Board (LRCB)</li>
<li>Upper Reservoir Control Board (URCB)</li>
<li>Auxiliary Control Board (AUCB)</li>
<li>Pump Starting Control Board (PSCB)</li>
<li>Remote Terminal Unit (RTU)</li>
<li>Auxiliary Mechanical: Drainage Panel, Dewatering Panel &amp; Cooling System&amp;…</li>
<li>Electrical Protection System (Unit1-4)</li>
</ul>
<p><strong>Services:</strong> Engineering, Procurement, Manufacturing, Installation &amp; Commissioning<br />
<strong>DCS Type:</strong> Persia A (KermanTablo DCS)</p>
<p>The post <a href="http://kermantablo.com/en/?p=764">SiahBisheh Pumped Storage Project</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://kermantablo.com/en/?feed=rss2&#038;p=764</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>IGAT V</title>
		<link>http://kermantablo.com/en/?p=754&#038;utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=igat-v</link>
		<comments>http://kermantablo.com/en/?p=754#comments</comments>
		<pubDate>Sun, 28 Oct 2012 19:11:54 +0000</pubDate>
		<dc:creator>Sahar Maroofi</dc:creator>
				<category><![CDATA[Clients]]></category>
		<category><![CDATA[Oil & Gas]]></category>
		<category><![CDATA[References]]></category>

		<guid isPermaLink="false">http://kermantablo.com/en/?p=754</guid>
		<description><![CDATA[<p>  </p><p>The post <a href="http://kermantablo.com/en/?p=754">IGAT V</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></description>
				<content:encoded><![CDATA[<p><strong>Client:</strong> National Iranian Gas Company NIGC<br />
<strong>Consultants:</strong> Oil Turbo compressor engineering company<br />
<strong>Location:</strong> Assaluye, Khormooj, Sardasht, Abpalchsh<br />
<strong>General Contractor:</strong> Oil turbo compressor engineering company<br />
<strong>Status:</strong> Site Acceptance Test(SAT)<br />
<strong>Objective:</strong><br />
Transmission of Sour Gas of Aghajari Wellhead Area for Gas Injection<br />
<strong>Plant Characteristics:</strong><br />
The dry gas is transported 500Km 56” pipeline for injection into the AGHA-JARI reservoir,<br />
2 GCS located in phase 6.788 &amp; 3 other GCS located along the pipeline,<br />
<strong>KTC Scope of work:</strong><br />
Power transformers, MV switchers, LV switchers &amp; MMC &amp; Capacitors. Aux, dist., panel, alarm panels, power management system, lv bus duct, dc &amp; ups systems, EEX lighting (fixtures &amp; socket outlet), normal lighting system, all lighting panels, lighting &amp; earth systems, EEX j.b &amp; glands, cable tray and ladders, EEX and normal local control station, conduits, neutral ground</p>
<p>The post <a href="http://kermantablo.com/en/?p=754">IGAT V</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://kermantablo.com/en/?feed=rss2&#038;p=754</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Persian Gas refinery and power plant</title>
		<link>http://kermantablo.com/en/?p=746&#038;utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=persian-gas-refinery-and-power-plant</link>
		<comments>http://kermantablo.com/en/?p=746#comments</comments>
		<pubDate>Sun, 28 Oct 2012 19:01:48 +0000</pubDate>
		<dc:creator>Sahar Maroofi</dc:creator>
				<category><![CDATA[Clients]]></category>
		<category><![CDATA[Oil & Gas]]></category>

		<guid isPermaLink="false">http://kermantablo.com/en/?p=746</guid>
		<description><![CDATA[<p>Client: Iranian Gas Engineering and Development Company (IGEDC) Location: Lamerd General Contractor: FARAB Co. Status: In progress Objective: -Power Management System (PMS) -Power Distribution Control System (PDCS) -Distributed Control System (DCS) -Load Sharing, Unit commitment, Automatic Generation Con&#8212;.trol (AGC) and Frequency control -Power study such as: Load flow, Short circuit, Motor &#8211;.starting,Contingency analysis, Stability analysis, Protection and &#8230;.Relay Coordination [&#8230;]</p><p>The post <a href="http://kermantablo.com/en/?p=746">Persian Gas refinery and power plant</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></description>
				<content:encoded><![CDATA[<p><strong>Client:</strong> Iranian Gas Engineering and Development<br />
Company (IGEDC)<br />
<strong>Location:</strong> Lamerd<br />
<strong>General Contractor:</strong> FARAB Co.<br />
<strong>Status:</strong> In progress<br />
<strong>Objective:</strong><br />
-Power Management System (PMS)<br />
-Power Distribution Control System (PDCS)<br />
-Distributed Control System (DCS)<br />
-Load Sharing, Unit commitment, Automatic Generation Con&#8212;.trol (AGC) and Frequency control<br />
-Power study such as: Load flow, Short circuit, Motor &#8211;.starting,Contingency analysis, Stability analysis, Protection and &#8230;.Relay Coordination<br />
-Intelligent and optimal Load Shedding<br />
-Synchronizing between units and main bus ties<br />
-Dynamic simulation of Power Plant and Refinery<br />
<strong>Plant Characteristics:</strong><br />
Parsian Gas Treating Company has built six Gas Turbine<br />
Generators (GTG). is working in Island and parallel mode<br />
with national grid.<br />
<strong>KTC Scope of work:</strong><br />
-engineering<br />
-procurement<br />
-manufacturing<br />
-training<br />
-supervisory on Commissioning and Installation<br />
-fAT &amp; SAT</p>
<p>The post <a href="http://kermantablo.com/en/?p=746">Persian Gas refinery and power plant</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://kermantablo.com/en/?feed=rss2&#038;p=746</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>SCADA of IOOC Offshore &amp; Onshore Platforms</title>
		<link>http://kermantablo.com/en/?p=736&#038;utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=scada-of-iooc-offshore-onshore-platforms</link>
		<comments>http://kermantablo.com/en/?p=736#comments</comments>
		<pubDate>Sun, 28 Oct 2012 18:53:16 +0000</pubDate>
		<dc:creator>Sahar Maroofi</dc:creator>
				<category><![CDATA[Clients]]></category>
		<category><![CDATA[Oil & Gas]]></category>
		<category><![CDATA[References]]></category>

		<guid isPermaLink="false">http://kermantablo.com/en/?p=736</guid>
		<description><![CDATA[<p>   </p><p>The post <a href="http://kermantablo.com/en/?p=736">SCADA of IOOC Offshore &#038; Onshore Platforms</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></description>
				<content:encoded><![CDATA[<p><strong>Client:</strong> NIOC-IOOC<br />
<strong>Contractor:</strong> KTC<br />
<strong>Status:</strong> Under Progress<br />
<strong>Objectives:</strong><br />
SCADA of IOOC Offshore &amp; Onshore Platforms within the Persian Gulf area including Kharg, Bahregan, Sirri &amp; Lavan districts and Tehran.<br />
<strong>Plant Characteristics:</strong><br />
-SCADA System, Historian &amp; Web Servers<br />
-ICSS(ESD) System includes monitoring and control of<br />
RTUs on wellheads &amp; Production Platforms<br />
-Radio Communication System<br />
-CCTV System<br />
-PV &amp; other supply Systems<br />
-Instrumentation<br />
<strong>KTC scope of work:</strong> EPC</p>
<p>The post <a href="http://kermantablo.com/en/?p=736">SCADA of IOOC Offshore &#038; Onshore Platforms</a> appeared first on <a href="http://kermantablo.com/en">Kerman Tablo Corp.</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://kermantablo.com/en/?feed=rss2&#038;p=736</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>